-->
Marketing
Location: Home 》Marketing
Problems after long-term use of glass-lined reactors
Time:2023.10.13
Publisher:adminszx
View:62

Glass lined reactor and other enamelled equipment with its corrosion resistance, pressure resistance, temperature resistance and other characteristics, is now widely used in pharmaceutical, wine-making, printing and dyeing, chemical and other important production areas. However, due to the reactor wall glass lining magnetic layer has the fragility, so the reactor users must be careful to operate in strict accordance with the requirements to ensure the normal operation of the equipment, to extend the service life of enamelled equipment. The following is an introduction to the glass-lined reactor feeding operation discharge precautions:


First of all, the glass lined reactor should be especially careful when charging, should try to avoid empty tank heating material or hot tank with cold material, too large a temperature shock for the performance of the enamel has a certain impact, and at the same time should ensure that there will not be any hard solid objects tuned into the kettle for the non-must be added to the bulk of the hard materials, they should be crushed and added.


Secondly, the glass lined reactor should be noted in the operation process, through the jacket of the equipment to warm up, to slowly pressurised warming. To pre-pass into the 0.1MPa pressure, keep a quarter of an hour, and then slowly pass into the steam up to the operating pressure. During the operation of the reactor equipment, pay attention to the sealing condition of the flange, catch plate, manhole and stuffing box, and take measures immediately if leakage is found.


For glass-lined reactor should pay special attention to the discharge, if the bottom of the reaction kettle clogging problems, can not be shovelled with metal utensils, this time you can use a bamboo stick or plastic stick, wooden stick gently poke open. The end of the reaction needs to be cooled, the temperature inside the tank must be naturally reduced to a certain degree before passing cooling water to the jacket, to prevent sudden cooling.


Industry in the reaction of the material storage needs corresponding equipment, glass lined reactor is the chemical reaction equipment, corrosion resistance, performance requirements are very high, but after long-term use there will always be some problems, leakage is the reaction kettle more problems, but also more serious, if it is corrosive or toxic substances leakage, the consequences are unimaginable. Improper position of oil ring or oil blockage can not form an oil seal, there will be leakage; kettle gland is not pressed tightly, the quality of filler is not good will also affect the sealing performance; stirring shaft in the filler at the wear or corrosion, resulting in a gap is too large will also leak. At this time, you need to adjust the position of the oil ring, clean the oil circuit; press the packing, or replace the packing; replace the stirring shaft and so on.


Operation process, there may also be improper operation caused by leakage, so it is necessary to operate and use correctly, in accordance with the specifications to ensure stable operation, and take protective measures. The glass lined reactor should be maintained frequently to reduce leakage and prolong the service life.


Products
Marketing

Shandong Glass-lined Technology Group


A. Core manufacturing enterprises

Enterprise Name: Shandong Huaxing Special Equipment Co.

Tel: 0533 - 2900117

Operation Factory Manager:135 0643 1373 Xiao Factory Manager

Sales Manager: 139 5333 6663 Xiao Manager

Address: Fujia Village, Fujia Town, Zibo Economic Development Zone, Shandong Province (South of Haidai Avenue Road)


B. Southwest Regional Office

Unit Name: Chengdu Yufeng Industrial Enamelling Co.

Regional Manager: Mr Xu

Tel: 139 0802 7862

Office Address: No.10, Annex 5, Section 5, South Section 3, Second Ring Road, Wuhou District, Chengdu, Sichuan, China

Hot Line:

135 0643 1373

Address:
Fujia Village, Fujia Town, Zibo Economic Development Zone, Shandong Province (Haidai Avenue)
Scan code to see more

Shandong Huaxing Special Equipment Co.,Ltd.

Zibo Huaxing Chemical equipment Factory

Enterprise Tel:0533 - 2900117

Operation Director:135 0643 1373 Xiao Factory Director

Sales Manager:139 5333 6663 Xiao Manager

Southwest Office:139 0802 7862 Mr Xu

ONLINE MESSAGE
Name:
Tel:
Content:
CopyRight ? 2024. Zibo Huaxing Chemical Equipment Factory All Rights Reserved.
Technical Support: CTC.network

Home

About

Honor

News

Outbound

Cases

Contact

CH

EN